Grading & Drainage Permits
No person shall commence construction prior to obtaining the appropriate grading and drainage permit as defined. In order to preclude inappropriate phasing of developments to circumvent the intent of this ordinance, when a proposed development activity will occur on a lot or parcel of land that has contiguous lots or parcels of lands owned by the same property owner, then the criteria as defined in this division will be applied to the total land area compiled from aggregate ownership parcels. See section 3-8-11 in our stormwater ordinance for permit requirements.
Class 1 Permit
- $40 fee, plus $0.50 per cubic yard of fill
- Adding 1,000 to 10,000 square feet of Impervious Surface
- 16 to 99 Cubic Yards of Fill
Class 2 Permit
- $125 fee, plus $0.50 per cubic yard of fill
- Adding 10,000 to 43,559 square feet of Impervious Surface
- Land disturbing activity of 10,000 to 43,559 square feet
- More than 100 Cubic Yards of fill
- Land disturbing activity on areas where slope exceeds 7%
Class 3 Permit
- $350 fee, plus $0.50 per cubic yard of fill
- Adding 43,560 square feet or more of Impervious Surface
- Land disturbing activity of 43,560 square feet or more
- A copy of your NOI from the IL EPA is required
Typical activities requiring Grading & Drainage permits
There are many land disturbing activities that require a permit, here are some examples:
- New Construction - New dwellings, accessory buildings, this may also include building a driveway or installing a septic system.
- Constructing a pond - Certain size ponds require a permit from IDNR. You must first get their approval.
- Construction of a new road or driveway.
- Brush clearing
- Fill projects
- Installing septic systems